Safe Electrical Work.
Done Right.
From a faulty switch to complete home wiring, get verified electricians for installation, repair, electrical safety checks and emergency assistance.
Small repair? Book instantly. Major wiring? Inspection and quotation first. Serving Patna.

What do you need help with?
Popular Electrical Services
Switch Replacement
15–30 min
Broken, sparking or loose switches.
What's included (4)
Removal of faulty switch
Replacement unit installation labour
Connection check
Basic testing
Not included (2)
Switch cost — supply your own or buy approved modular switches
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Ceiling Fan Installation
45–60 min
New ceiling fan fitting on an existing hook/point.
What's included (3)
Assembly & mounting labour
Connection & regulator wiring
Speed & wobble test
Not included (4)
Fan cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
New hook/core cutting
False-ceiling support
Any additional charge requires your approval before work begins.
Fuse / MCB Replacement
30–45 min
Tripping or burnt MCBs and blown fuses in the distribution board.
What's included (4)
Load & fault check
MCB/fuse replacement labour
Connection tightening
Trip test
Not included (3)
MCB cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Busbar/panel repair
Any additional charge requires your approval before work begins.
Bulb / Holder Installation
10–20 min
Bulb or holder replacement on existing points.
What's included (3)
Fitting labour
Connection check
Glow test
Not included (2)
Bulb/holder cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Zaddy Electrical Health Check
60–120 min
Find electrical risks before they become emergencies — ideal for older homes and newly rented/purchased properties.
A visual/basic safety inspection by a trained electrician — not a certification or laboratory-grade test. Report shows Safe / Needs Attention / Urgent Repair indicators.
What's included (9)
Switchboards & loose socket checks
Burn mark inspection
MCB & distribution board review
Common exposed wiring check
High-load appliance point review
Earthing-related indications
Fan & heavy load points
Electrical heating indicators
Digital Electrical Health Report in My Home
Not included (2)
Rectification labour
Materials
Any additional charge requires your approval before work begins.
Electrical Quick Fix Combo
60–90 min
Up to 4 minor electrical tasks in one visit — one visit charge, multiple fixes.
What's included (3)
Up to 4 eligible minor tasks (switch/socket replacement or repair, fan regulator, bulb holder, tube light, doorbell)
Single visit
Function test of all work
Not included (2)
Materials & parts
Work beyond the selected tasks
Any additional charge requires your approval before work begins.
Not Sure What to Book?
Switch/socket broken or sparkingSwitch & Socket Repair
New light or fan to installLighting / Fan Installation
Power keeps trippingMCB Tripping Diagnosis
Shocks from appliancesEarthing Inspection
Backup not workingInverter & Battery Services
Old or renovation wiringWiring Site Survey
Guidance only — the technician confirms the actual requirement after inspection.
Electrical Emergency?
Sparks from switchboard · burning smell · short circuit · repeated main MCB tripping · partial power failure · burnt socket · water entering an electrical point · shock from appliance · exposed live wire · panel overheating.
If there is fire, smoke, severe sparking or immediate danger, keep people away from the affected area and contact the appropriate emergency service. Switch off the main electrical supply only when it can be done safely. Never open switchboards or repair live electrical equipment yourself.
Priority visit — subject to technician availability in your area · emergency/priority visit charge shown before confirmation
Switch & Socket
Fixed-price small jobs — material extra, always with your approval before purchase.
Switch Replacement
15–30 min
Broken, sparking or loose switches.
What's included (4)
Removal of faulty switch
Replacement unit installation labour
Connection check
Basic testing
Not included (2)
Switch cost — supply your own or buy approved modular switches
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Socket Replacement
15–30 min
Damaged, loose or burnt sockets.
What's included (4)
Removal of faulty socket
Replacement unit installation labour
Polarity & connection check
Basic testing
Not included (2)
Socket cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Switchboard Repair
30–45 min
Loose boards, crackling switches, partial power in a room.
What's included (4)
Board inspection
Standard repair labour
Connection tightening
Function test
Not included (2)
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Plate/board replacement material
Any additional charge requires your approval before work begins.
Dimmer Installation
20–40 min
Dimmable lighting control for any room.
What's included (4)
Power isolation
Dimmer fitting labour
Compatibility check
Function test
Not included (2)
Dimmer cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
USB Socket Installation
30–45 min
USB charging points in bedrooms and living areas.
What's included (3)
Power isolation
USB socket fitting labour
Charging test
Not included (2)
USB socket cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Switch Repair
15–30 min
Loose, crackling or intermittently working switches.
What's included (4)
Power isolation
Standard repair labour
Connection tightening
Function test
Not included (1)
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Socket Repair
15–30 min
Loose sockets that don't hold plugs firmly.
What's included (4)
Power isolation
Standard repair labour
Connection tightening
Polarity & function test
Not included (1)
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Switchboard Replacement
45–60 min
Cracked, burnt or outdated switchboards.
What's included (4)
Power isolation
Board replacement labour
Connection & load check
Function test
Not included (2)
Board, plate & switch material
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
New Switchbox Installation
45–75 min
Adding a new switchboard point in a room.
What's included (3)
Point marking
Box fitting labour (surface)
Connection & test
Not included (3)
Box, switches & wire cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Concealed wiring / wall cutting
Any additional charge requires your approval before work begins.
6A Socket Installation
15–30 min
Regular 6A sockets for everyday appliances.
What's included (3)
Power isolation
Socket fitting labour
Polarity & function test
Not included (2)
Socket cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
16A Power Socket Installation
30–45 min
Heavy-appliance 16A sockets on an existing suitable point.
What's included (3)
Power isolation
16A socket fitting labour
Load & function test
Not included (3)
Socket cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
New point wiring
Any additional charge requires your approval before work begins.
Fan Services
Ceiling, wall, exhaust, BLDC and decorative fans.
Ceiling Fan Installation
45–60 min
New ceiling fan fitting on an existing hook/point.
What's included (3)
Assembly & mounting labour
Connection & regulator wiring
Speed & wobble test
Not included (4)
Fan cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
New hook/core cutting
False-ceiling support
Any additional charge requires your approval before work begins.
Ceiling Fan Repair
30–60 min
Slow, noisy, wobbling or non-starting fans.
What's included (4)
Motor & capacitor inspection
Standard repair labour
Regulator check
Speed test
Not included (2)
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Motor rewinding (outsourced, quoted after inspection)
Any additional charge requires your approval before work begins.
Exhaust Fan Installation
45–60 min
Kitchen and bathroom exhaust fans.
What's included (3)
Standard opening fitting
Mounting labour
Connection & test
Not included (3)
Fan cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Wall cutting/civil work
Any additional charge requires your approval before work begins.
Fan Regulator Repair / Replacement
20–30 min
Stuck or broken fan speed regulators.
What's included (3)
Power isolation
Regulator replacement labour
Speed test
Not included (2)
Regulator cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Wall Fan Installation
30–45 min
Wall-mounted fans in kitchens and small rooms.
What's included (3)
Marking & standard drilling
Mounting labour
Connection & test
Not included (2)
Fan cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Decorative / Heavy Fan Installation
45–75 min
Oversized, designer or heavy ceiling fans.
Additional technician / TaskMate may be required for safe handling of oversized or heavy fans.
What's included (3)
Assembly & mounting labour
Remote/receiver pairing
Speed & wobble test
Not included (3)
Fan cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
New hook/core cutting
Any additional charge requires your approval before work begins.
Ceiling Fan Replacement
45–60 min
Swapping an old fan for a new one on the same point.
What's included (4)
Old fan removal
New fan assembly & mounting labour
Connection
Speed & wobble test
Not included (2)
Fan cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Ceiling Fan Uninstallation
20–30 min
Safe fan removal before painting, moving or replacement.
What's included (3)
Power isolation
Fan removal labour
Point safety cap
Not included (2)
Repairs
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
BLDC / Smart Fan Installation
45–60 min
Energy-saving BLDC and remote-controlled smart fans.
What's included (3)
Assembly & mounting labour
Remote/receiver pairing
Speed & wobble test
Not included (2)
Fan cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Pedestal / Tower Fan Setup
20–30 min
Assembly and safe setup of pedestal and tower fans.
What's included (3)
Assembly
Placement & stability check
Function test
Not included (2)
Fan cost
Repairs
Any additional charge requires your approval before work begins.
Lights & Fixtures
From bulbs to chandeliers — per-fixture pricing, quantity selectable while booking.
Light Installation (General)
20–30 min
Bulbs, tubelights and basic fixtures on existing points.
What's included (3)
Fixture fitting labour
Connection & earthing check
Function test
Not included (3)
Light/bulb cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
New wiring point
Any additional charge requires your approval before work begins.
Ceiling Light Installation
30–45 min
Ceiling-mounted lights, panels and downlights.
What's included (3)
Marking & standard drilling
Fixture mounting labour
Connection & test
Not included (3)
Fixture cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
False-ceiling cutting
Any additional charge requires your approval before work begins.
Chandelier Installation
60–120 min
Chandeliers and heavy decorative fixtures.
Heavy chandelier installation may need TaskMate assistance, ladder/height support or an additional electrician — the final price is always shown before work starts.
What's included (4)
Support assessment
Mounting labour
Connection & dimmer check
Level & stability test
Not included (3)
Fixture cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Ceiling reinforcement
Any additional charge requires your approval before work begins.
LED Strip / Cove Light Installation
45–75 min
Cove, profile and under-cabinet LED strips.
What's included (4)
Strip mounting labour
Driver connection
Adhesive/channel fitting
Glow test
Not included (2)
Strip, driver & channel cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Mirror / Bathroom Light Installation
30–45 min
Bathroom and dressing-area vanity lights.
What's included (3)
Marking & standard drilling
Fixture mounting labour
Connection & test
Not included (2)
Fixture cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Outdoor Light Installation
30–60 min
Weatherproof outdoor, gate and balcony fixtures.
What's included (3)
Mounting labour
Weatherproof connection
Function test
Not included (3)
Fixture cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Height work beyond standard ladder
Any additional charge requires your approval before work begins.
False Ceiling / Downlight Installation
30–45 min
Per-light point work in false ceilings.
What's included (3)
Point wiring labour
Fixture connection
Function test
Not included (3)
Fixture cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
False-ceiling repair
Any additional charge requires your approval before work begins.
Bulb / Holder Installation
10–20 min
Bulb or holder replacement on existing points.
What's included (3)
Fitting labour
Connection check
Glow test
Not included (2)
Bulb/holder cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Tube Light Installation
15–25 min
Tube light fitting or replacement.
What's included (3)
Fitting labour
Connection check
Glow test
Not included (2)
Tube/fixture cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
LED Batten Installation
15–25 min
Slim LED battens for rooms, kitchens and balconies.
What's included (3)
Mounting labour
Connection
Glow test
Not included (2)
Batten cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Wall Light Installation
30–45 min
Wall-mounted decorative and reading lights.
What's included (3)
Marking & standard drilling
Mounting labour
Connection & test
Not included (2)
Fixture cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Decorative Light Installation
30–60 min
Designer fixtures, profile lights and accent lighting.
What's included (3)
Fixture assessment
Standard mounting labour
Connection & test
Not included (3)
Fixture cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
False-ceiling modification
Any additional charge requires your approval before work begins.
Pendant Light Installation
45–60 min
Hanging pendant lights over dining and kitchen counters.
What's included (3)
Support assessment
Mounting labour
Connection & level test
Not included (3)
Fixture cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Ceiling reinforcement
Any additional charge requires your approval before work begins.
Decorative / Festival Light Setup
60–120 min
Festive lighting for Diwali, weddings and occasions.
What's included (4)
Layout planning
Standard installation labour
Safe connections
Glow test
Not included (3)
Lights & decor cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Height work beyond standard ladder
Any additional charge requires your approval before work begins.
Electrical Fault & Repair
Fault found first, estimate approved by you, then chargeable work begins.
Electrician Inspection Visit — ₹149
If you approve a qualifying repair in the same visit, the inspection fee may be adjusted as per Zaddy Fixit business rules. Final estimate is always shown and approved before extra work begins.
Electrician Inspection Visit
30–45 min
Unsure what's wrong — let a verified electrician diagnose it.
If you approve a qualifying repair in the same visit, the inspection fee may be adjusted as per Zaddy Fixit business rules. Final estimate is always shown and approved before extra work begins.
What's included (4)
Technician visit
Problem inspection
Basic diagnosis
Repair estimate
Not included (2)
Repair labour
Materials & parts
Any additional charge requires your approval before work begins.
Electrical Fault Diagnosis
45–60 min
Power trips, dead circuits, burning smell or shocks.
What's included (4)
Circuit tracing
Load & insulation check
Fault identification
Repair estimate
Not included (2)
Repair labour
Materials
Any additional charge requires your approval before work begins.
MCB / RCCB / Distribution Board
The safety core of your home's electrical system.
Fuse / MCB Replacement
30–45 min
Tripping or burnt MCBs and blown fuses in the distribution board.
What's included (4)
Load & fault check
MCB/fuse replacement labour
Connection tightening
Trip test
Not included (3)
MCB cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Busbar/panel repair
Any additional charge requires your approval before work begins.
Distribution Board Inspection
45–60 min
Old or overloaded DB panels, frequent tripping.
What's included (4)
DB inspection
MCB/ELCB health check
Load balance review
Written findings
Not included (2)
Repair labour
Parts
Any additional charge requires your approval before work begins.
New Distribution Board Installation
Site visit
New DB panels, capacity upgrades or full panel replacement.
Site visit ₹299
Inspection + quotation required
RCCB Installation
60–90 min
Shock protection for the whole home.
What's included (3)
Load assessment
RCCB/ELCB fitting labour
Trip & leakage test
Not included (2)
RCCB/ELCB unit cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Single-Pole MCB Installation
30–45 min
Adding or replacing a single-pole MCB.
What's included (3)
Power isolation
MCB fitting labour
Connection & trip test
Not included (2)
MCB cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Double-Pole MCB Installation
30–45 min
Main or heavy-circuit double-pole MCB work.
What's included (3)
Power isolation
MCB fitting labour
Connection & trip test
Not included (2)
MCB cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
RCBO Installation
60–90 min
Per-circuit overload + leakage protection.
What's included (3)
Load assessment
RCBO fitting labour
Trip & leakage test
Not included (2)
RCBO unit cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
MCB Tripping Diagnosis
30–60 min
MCB trips repeatedly without an obvious reason.
What's included (4)
Circuit isolation test
Load check
Fault identification
Repair estimate
Not included (2)
Repair labour
Materials
Any additional charge requires your approval before work begins.
Distribution Board Repair
60–90 min
Damaged busbars, loose connections, burnt DB sections.
What's included (4)
DB fault diagnosis
Standard repair labour
Connection tightening
Trip test
Not included (2)
Busbar/panel parts
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Load Balancing
60–90 min
Uneven loads causing tripping on specific circuits.
What's included (3)
Circuit load measurement
Rebalancing labour (standard)
Verification test
Not included (3)
Rewiring
Parts
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Three-Phase Electrical Diagnosis
60–90 min
Phase imbalance, missing phase or three-phase faults.
What's included (3)
Phase-to-phase measurement
Load distribution review
Findings & estimate
Not included (3)
Repair labour
Materials
Utility-side supply issues (DISCOM)
Any additional charge requires your approval before work begins.
Materials are not included unless specifically stated. High-capacity distribution-board work always requires an inspection before final quotation.
Electrical Wiring & New Points
Per-point and per-metre labour pricing for small scopes; surveys for big ones.
New Electrical Point
30–60 min
Extra socket/point from a nearby existing circuit.
What's included (3)
Point extension labour (standard length)
Socket/point fitting labour
Polarity & load test
Not included (3)
Socket & wire cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Concealed wiring
Any additional charge requires your approval before work begins.
External Wiring
30–60 min
Surface/casing wiring for new points and extensions.
What's included (3)
Surface wiring labour (per 5 m)
Casing fitting
Continuity & load test
Not included (2)
Wire, casing & material cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Concealed / Internal Wiring
60–120 min
In-wall concealed wiring for a clean finish.
What's included (2)
Concealed wiring labour (per 5 m)
Continuity & load test
Not included (3)
Wire & material cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Wall cutting, civil repair & repainting
Any additional charge requires your approval before work begins.
Heavy Load Point
45–75 min
Dedicated points for heavy appliances.
What's included (3)
Point wiring labour (standard length)
16A point fitting labour
Load test
Not included (3)
Wire, socket & MCB cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Concealed wiring
Any additional charge requires your approval before work begins.
AC Electrical Point
45–75 min
Dedicated AC power point with suitable protection.
What's included (3)
Point wiring labour (standard length)
Socket/isolator fitting labour
Load test
Not included (2)
Wire, socket, isolator & MCB cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Geyser Electrical Point
45–60 min
Safe geyser power point in bathrooms/kitchens.
What's included (3)
Point wiring labour (standard length)
16A point fitting labour
Load & earthing test
Not included (2)
Wire, socket & MCB cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Kitchen Appliance Point
45–60 min
Dedicated points for microwave, OTG, mixer or dishwasher.
What's included (3)
Point wiring labour (standard length)
Socket fitting labour
Load test
Not included (2)
Wire & socket cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Washing Machine Power Point
30–60 min
Earthed power point for washing machines.
What's included (3)
Point extension labour
Socket fitting labour
Polarity & earthing test
Not included (2)
Wire & socket cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Refrigerator Power Point
30–60 min
Dedicated earthed refrigerator point.
What's included (3)
Point extension labour
Socket fitting labour
Polarity & earthing test
Not included (2)
Wire & socket cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Complete Wiring Projects
Complete room wiring, full home rewiring and commercial work are never guess-priced — share your property details, schedule an Electrical Survey, and approve a written quotation first.
Full Home Rewiring
Old wiring, frequent faults or renovation-driven rewiring.
New Circuit Installation
Dedicated circuits for kitchens, ACs or new rooms.
Office / Commercial Wiring
Workstation points, lighting grids and DB work at commercial sites.
Complete Room Wiring
Full wiring for one room — points, lights and circuits.
Earthing & Leakage Safety
Shocks, leakage, heating and tripping — diagnosed properly before any repair.
Earthing Repair
45–60 min
Shocks from appliances, weak or missing earthing.
What's included (4)
Earth continuity test
Socket earthing check
Standard repair labour
Report
Not included (2)
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Earth pit work (quoted separately)
Any additional charge requires your approval before work begins.
Voltage Fluctuation Diagnosis
30–45 min
Flickering lights, appliances burning out.
We diagnose and fix inside-home issues. Voltage problems originating from the electricity utility (DISCOM) supply network must be resolved by your distribution company.
What's included (3)
Point-to-point voltage measurement
Neutral/earth check
Findings & recommendation
Not included (2)
Rectification labour
Stabilizer/parts
Any additional charge requires your approval before work begins.
Earthing Inspection
45–60 min
Weak or suspect earthing — shocks, tingling appliances.
What's included (4)
Basic earthing connection check
Visible wiring inspection
Electrical leakage symptoms review
Recommendation report
Not included (3)
Repair labour
Earth pit work
Materials
Any additional charge requires your approval before work begins.
New Earthing Installation
Site survey
New earth pit / earthing system for the property.
Site visit ₹299
Site survey + quotation
Electric Leakage Diagnosis
45–60 min
High bills, ELCB tripping or suspected current leakage.
What's included (4)
Circuit-wise leakage check
Insulation observation
Fault identification
Repair estimate
Not included (2)
Repair labour
Materials
Any additional charge requires your approval before work begins.
Shock / Current Leakage Investigation
45–60 min
Tingling or shocks from appliances, taps near wiring or switchboards.
What's included (4)
Source tracing
Earthing & polarity check
Safety recommendation
Repair estimate
Not included (2)
Repair labour
Materials
Any additional charge requires your approval before work begins.
Loose Connection / Heating Diagnosis
30–45 min
Warm switches, sparking sounds or flickering under load.
What's included (3)
Hotspot identification
Connection check
Findings & estimate
Not included (2)
Repair labour
Materials
Any additional charge requires your approval before work begins.
Burnt Socket Investigation
30–45 min
Blackened, melted or smelling sockets.
What's included (4)
Cause investigation
Load & wiring check
Safety recommendation
Repair estimate
Not included (1)
Socket replacement labour & material
Any additional charge requires your approval before work begins.
Repeated MCB Tripping
30–60 min
Main MCB trips again and again without clear cause.
What's included (4)
Circuit isolation
Load measurement
Fault identification
Repair estimate
Not included (2)
Repair labour
Materials
Any additional charge requires your approval before work begins.
Inside-home electrical issue
Wiring, sockets, switchboards, earthing, MCB/DB, appliance points — our electricians diagnose and fix these.
Electricity utility / DISCOM supply issue
Voltage problems from the supply network, sealed meters and external supply faults belong to your distribution company — we never tamper with them.
Find Electrical Risks Before They Become Emergencies.
A structured visual safety inspection of your home's electrical system, ending in a digital Electrical Health Report saved to My Home with clear Safe / Needs Attention / Urgent Repair indicators.
A visual/basic safety inspection by a trained electrician — not a certification or laboratory-grade electrical test.
Doorbell & Smart Electrical
Doorbells, video doorbells, smart switches and sensors — with app pairing assistance.
Doorbell Installation
30–45 min
Wired or wireless doorbell setup.
What's included (3)
Bell & switch mounting labour
Connection/pairing
Ring test
Not included (2)
Doorbell cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Doorbell Replacement
30–45 min
Replacing a faulty or old doorbell.
What's included (4)
Old unit removal
New unit mounting labour
Connection/pairing
Ring test
Not included (2)
Doorbell cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Video Doorbell Installation
45–75 min
Smart video doorbells with app setup.
What's included (4)
Mounting labour
Wiring/power setup
App pairing assistance
Function test
Not included (3)
Doorbell cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Wi-Fi/router issues
Any additional charge requires your approval before work begins.
Smart Switch Installation
30–45 min
App and voice-controlled modular smart switches.
What's included (4)
Power isolation
Smart switch fitting labour
Pairing assistance
Function test
Not included (2)
Smart switch cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Wi-Fi Smart Switch Installation
30–50 min
Wi-Fi switches for remote and scheduled control.
What's included (4)
Power isolation
Switch fitting labour
App pairing assistance
Function test
Not included (3)
Switch cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Wi-Fi/router issues
Any additional charge requires your approval before work begins.
Smart Relay Installation
45–60 min
In-wall smart relays behind existing switchboards.
What's included (4)
Power isolation
Relay fitting labour
Pairing assistance
Function test
Not included (2)
Relay cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Motion Sensor Light Installation
45–60 min
Auto on/off lights for passages, bathrooms and entrances.
What's included (3)
Sensor mounting labour
Connection
Range & function test
Not included (2)
Sensor/light cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Smart Lighting Setup
Site visit
Whole-room or whole-home smart lighting scenes.
Site visit ₹299
Inspection / quotation
Need cameras or a fuller security setup? See .
Heavy Appliance Power Points & Connections
We handle the electrical point and connection — internal appliance repair stays with Appliance Repair.
Isolator Installation
45–60 min
Dedicated isolator for AC, geyser or heavy appliances.
What's included (2)
Isolator fitting labour
Connection & load test
Not included (2)
Isolator cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
AC / Geyser Heavy-Duty Power Point (15A/16A)
45–60 min
Heavy-appliance 15A/16A points from the DB.
What's included (3)
Point wiring labour (standard length)
15A/16A socket fitting labour
Load test
Not included (3)
Wire, socket & MCB cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Concealed wiring
Any additional charge requires your approval before work begins.
AC Power Connection
30–45 min
Electrical connection of an AC to an existing suitable point.
What's included (3)
Connection labour
Polarity & earthing check
Load test
Not included (2)
AC installation/repair (see AC Service)
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Geyser Electrical Connection
30–45 min
Safe electrical connection of a geyser.
What's included (3)
Connection labour
Earthing check
Load test
Not included (2)
Geyser plumbing/mounting
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Microwave / OTG Power Point
30–45 min
Dedicated kitchen appliance connection.
What's included (3)
Connection/point labour
Polarity check
Load test
Not included (2)
Wire & socket cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Induction / Hob Electrical Point
30–60 min
High-load induction cooktop power point.
What's included (3)
Point labour (standard length)
16A fitting labour
Load test
Not included (2)
Wire & socket cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Chimney Power Connection
30–45 min
Electrical connection for kitchen chimneys.
What's included (3)
Connection labour
Polarity check
Function test
Not included (2)
Chimney installation/ducting
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Water Pump Electrical Connection
45–60 min
Power supply connection for water pumps.
What's included (3)
Electrical connection labour
MCB connection
Power supply check
Not included (2)
Pump fitting & plumbing (see Plumbing)
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Pump Starter / Capacitor Diagnosis
30–60 min
Pump not starting, humming or tripping.
What's included (4)
Starter inspection
Capacitor-related electrical diagnosis
Control panel electrical inspection
Repair estimate
Not included (3)
Repair labour
Capacitor/parts
Pump mechanical work
Any additional charge requires your approval before work begins.
Automatic Water-Level Controller Installation
60–90 min
Auto pump on/off with tank-level sensors; float switch connection.
What's included (3)
Controller mounting labour
Float switch electrical connection
Wiring & test
Not included (3)
Controller/float switch cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Tank plumbing
Any additional charge requires your approval before work begins.
RO Power Point
30–45 min
Earthed power point for RO water purifiers.
What's included (3)
Point labour
Socket fitting labour
Polarity & earthing test
Not included (3)
Wire & socket cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
RO service (see RO & Water Purifier)
Any additional charge requires your approval before work begins.
Water pump — Electrical handles
Pump electrical connection · starter inspection · capacitor diagnosis · MCB connection · power supply check · control panel inspection · float switch & water-level controller.
Water pump — Plumbing handles
Pipe connection · pump fitting · borewell plumbing · water-flow issues · mechanical work. Your Zaddy Manager can coordinate both technicians in one plan.
Appliance not working internally? See .
Meter / Submeter / Changeover
Submetering and changeover switches for your own equipment.
Meter / Panel Upgrade
Site visit
Panel capacity upgrades and meter-room work (non-sealed equipment only).
Site visit ₹499
Site visit — quotation follows
Submeter Installation
60–90 min
Tenant or floor-wise submetering inside your property.
What's included (3)
Mounting labour
Connection
Reading verification
Not included (2)
Submeter cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Changeover Switch Installation
60–90 min
Grid-to-inverter/generator changeover.
What's included (3)
Load assessment
Changeover fitting labour
Switching test
Not included (2)
Changeover switch cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Three-Phase Changeover
90–120 min
Three-phase supply changeover setups.
What's included (3)
Phase assessment
Changeover fitting labour
Switching & balance test
Not included (2)
Changeover unit cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Manual Changeover
60–90 min
Simple manual grid/backup changeover.
What's included (3)
Changeover fitting labour
Connection
Switching test
Not included (2)
Changeover unit cost
Switches, sockets, wires, MCBs and other materials are charged separately unless explicitly included.
Any additional charge requires your approval before work begins.
Electrical Load Distribution Check
45–60 min
Verify circuit-wise load spread across your DB.
What's included (3)
Circuit load measurement
Distribution review
Written findings
Not included (2)
Rebalancing labour
Parts
Any additional charge requires your approval before work begins.
We never tamper with sealed utility meters, electricity-board seals or unauthorized supply connections. For electricity-board meter or external supply issues, please contact your electricity distribution company (DISCOM).
Build My Electrical Job
Complete multiple electrical jobs in one visit. Add up to 5 tasks — like 2 switches, 1 fan, 1 tube light and 1 MCB — and pay a single visit.
Pick your main job
Choose any fixed-price service to start.
Add more tasks in the booking
Tap extra jobs inside the booking dialog — live combined labour total.
One visit, one invoice
Single technician visit, digital invoice and service record in My Home.
Electrical Combos
Conversion-friendly bundles with a clearly defined scope.
Electrical Quick Fix Combo
Materials excluded. Choose up to 4 eligible minor tasks, completed in one visit.
₹499 materials excluded
Zaddy Electrical Safety Combo
Recommended for older homes and newly rented/purchased properties.
From ₹799
Add TaskMate Assistance
Supporting manpower for lifting, holding, ladder assistance, moving furniture and general non-technical support — ₹349/visit per TaskMate, added during booking or requested by your electrician with your approval.
Heavy chandelier handling
Large decorative fan installation
Long ladder setup
Moving furniture for wiring access
Cable pulling
Ceiling access assistance
Heavy appliance repositioning
Multiple-room jobs
TaskMates never independently perform specialist electrical work — they assist your verified electrician with safe handling only.
Member pricing on every electrical job
Discounted electrical labour (member price shown while booking)
Priority scheduling
Relationship Manager coordination
Electrical maintenance reminders
Preferential emergency assistance
Digital service history in My Home
Preventive electrical care, planned annually
Annual Electrical Health Check as AMC benefit/add-on
Switch/socket & fan connection checks
MCB/DB visual inspection
High-load point review
Visible loose wiring assessment
Safety recommendations report
Coverage depends on your actual AMC plan — repairs are included only where your plan says so.
Need the product too?
Buy from Zaddy Marketplace and add professional installation — product + installation in one flow.
Modular Switch 6A
₹104
LED Bulb 9W (Pack of 2)
₹217
MCB Single Pole 32A
₹265
Extension Board 4 Socket
₹569
Ceiling Fan 1200mm
₹1,899
Labour price does not include electrical materials unless specifically mentioned. You can provide your own material, ask the technician to procure approved material, or buy from Zaddy Marketplace. No material purchase happens without your digital approval.
Electrical Work You Can Trust.
Zaddy Service Assurance
Workmanship warranty
30-day Zaddy workmanship warranty on eligible electrical repairs/installations
Product warranty
Manufacturer warranty where applicable
Project work
As per approved quotation terms
Warranty does not cover:
Final warranty eligibility is stored against each booking on your digital invoice.
Included in every booking
Selected labour
Basic inspection related to the selected job
Installation/repair defined in booking scope
Post-work functional check
Digital invoice
Service record in My Home
Eligible workmanship warranty
Not included unless selected
Electrical material/components
Wall cutting & civil repair
Painting after concealed wiring
Scaffolding / specialist height equipment
Additional electrical points
Additional manpower (TaskMate)
Appliance internal repair
Full rewiring
Major panel replacement
For your safety, we don't take these as standard bookings
Live high-tension work
Transformer repairs
Unauthorized utility connections
Electricity theft / bypass work
Tampering with sealed electricity meters
Industrial high-voltage work
Major electrical fire restoration without inspection
Unsafe live-line repair
Such work is declined or escalated to appropriately qualified specialists — safety always comes before completing a booking.
Electrical Service FAQs
How much does an electrician visit cost?
An Electrician Inspection Visit is ₹149 and includes problem inspection, basic diagnosis and a repair estimate. If you approve a qualifying repair in the same visit, the fee may be adjusted as per Zaddy Fixit business rules.
Are electrical materials included in the price?
No — listed prices are labour. Switches, sockets, wires, MCBs and other materials are extra unless specifically mentioned. You can supply your own, ask the technician to procure approved material, or buy from Zaddy Marketplace. No material is ever purchased without your digital approval.
Can I book multiple small electrical jobs together?
Yes — Build My Electrical Job lets you combine several tasks (2 switches + 1 fan + 1 tube light + 1 MCB, for example) into one visit. Up to 5 jobs per visit, larger scopes go through inspection.
Do you repair ceiling fans?
Yes — ceiling fan repair starts at ₹149 and covers motor/capacitor inspection, standard repair labour and a speed test. Motor rewinding is outsourced and quoted after inspection.
Can you repair MCB tripping problems?
Yes — book MCB Tripping Diagnosis (₹199). The electrician isolates circuits, measures load, identifies the fault and shares an estimate before any repair.
Do you provide complete house wiring?
Yes — as a quotation project. Full home rewiring is never guess-priced: a site survey, load assessment and written quotation come first, and work starts only after your approval.
Can I buy switches or fans from Zaddy and get them installed?
Yes — pick products from Zaddy Marketplace and add professional installation in the same flow where available.
Can an electrician come for an emergency?
Yes — the Electrical Emergency panel books a priority visit (charges shown before confirmation). Assignment is subject to technician availability in your area.
Is electrical work covered under Zaddy Membership?
Yes — members get member pricing on electrical labour, priority scheduling, Zaddy Manager coordination, maintenance reminders and digital service history. Exact savings come from your membership plan.
Is electrical inspection included in AMC?
Home Care AMC plans can include an annual electrical health check as a benefit/add-on — check your plan coverage in My Home or ask your Zaddy Manager.
Can you install smart switches?
Yes — smart switch installation from ₹149, Wi-Fi switches from ₹199, smart relays and motion sensors from ₹249, with app pairing assistance.
Do you provide three-phase electrical work?
Yes — three-phase diagnosis (inspection from ₹399), load balancing and three-phase changeover installation.
Can you repair electricity-board meters?
No. We never tamper with sealed utility meters, electricity-board seals or unauthorized connections. For meter or external supply issues, please contact your electricity distribution company (DISCOM).
What warranty do I get after the service?
Eligible repairs and installations carry a 30-day Zaddy workmanship warranty. Products carry their manufacturer warranty. Warranty terms are stored against each booking on your digital invoice.
Need help deciding what electrician service to book?
Your Zaddy Manager can identify the right service, coordinate multi-service jobs and follow up after major work.
Every Switch. Every Socket. Every Circuit — Sorted.
Small repair? Book instantly. Multiple jobs? Add them together. Major wiring? Get a survey and quotation. Not sure? Ask your Zaddy Manager.